STATIC INDEX
Network entry · Across STATIC

STATIC Resilience Plan

An outage plan connecting critical loads with reserves, equipment and expected backup duration.

INSIDE STATIC RESILIENCE PLAN

Purpose, systems, and connections.

Resilience Plan describes what must remain powered, for how long and under which assumptions. Medical equipment, communications, refrigeration and other chosen priorities are treated as constraints.

Critical Loads

The household or business identifies the functions that must remain available.

Available Reserves

Battery, fuel, generation and minimum reserve inform the plan.

Duration Assumptions

Expected backup time stays connected to load and equipment assumptions.

How it connects

The existence of a battery does not guarantee a fixed safe duration, and price optimization cannot override declared critical loads.